What Keeps the Lights On at a Lake Wenatchee Cabin This Winter

At 10 p.m. on Friday, March 13, Chelan PUD crews were patrolling steep, snow-covered country in the dark. They were looking for whatever had cut power to about 3,800 customers between Anderson Canyon and the summit. By early Saturday they had found a tree on the line and removed it. As soon as they tried to reenergize, the line tripped out again. NCW News reported that the PUD then ordered a helicopter patrol, which found a second tree by noon. Full service came back around 8 p.m. Saturday.

If you're comparing cabins around Lake Wenatchee, that night shows you more than the price per kilowatt-hour does. The electricity is inexpensive. The cost to plan around is the transmission line that brings it in, and that line is about to spend several years under construction.

The bill is the easy part

Chelan PUD's standard residential rate, Schedule 1, is a $17.60 monthly basic charge plus 2.85 cents per kilowatt-hour. That's the rate in effect this fall, according to the PUD's rates page. As an illustration, a cabin using 1,000 kilowatt-hours in a winter month would pay about $46 at those rates.

That low price depends on the PUD's dam power. In a Leavenworth Echo report on the November 2 rate hearing, PUD staff said surplus power sales have historically let local customers pay below-cost electric rates. About 20% of the PUD's generation has historically gone to local demand, not counting data centers, and the rest has been available to sell. For 2027, staff project that electric rate revenue will cover about 62% of direct operating costs.

PUD staff proposed a five-year plan. Under it, electric rates would rise 5% each June 1 from 2027 through 2031, with the board reviewing them every year. Under the proposed schedule, the energy rate climbs from 3.00 cents in 2027 to 3.60 cents in 2031. The single-phase basic charge goes from $18.50 to $22.45 over the same years. Staff estimate the first year adds about $3.50 to an average monthly residential bill. Two commissioners asked during the November 2 debate whether the plan should start at a smaller increase. Staff brought the plan to the commission's November 16 meeting for adoption. The 2027 budget it feeds into is scheduled for consideration on December 7.

Using the 2031 figures from the proposed schedule, that same 1,000-kilowatt-hour month comes to about $58. Puget Sound buyers can compare that with their own utilities. The PUD's October 19 presentation lists proposed residential increases for Puget Sound Energy of about $28 a month, or 15.2%, in 2027. Seattle City Light's are about $10 a month, or 9.5%, in each of 2027 and 2028.

A 1930s line carries all of it

From Plain to Stevens Pass, power arrives on the Beverly-McKenzie transmission line. The PUD built it in the 1930s, and it runs power from Rock Island Dam to about 3,500 customers along that stretch. Much of its route crosses terrain where a downed tree is hard to reach. After one tree fell across the transmission line in late December 2022, a crew of PUD linemen drove a snowcat in from Sunitsch Canyon to remove it.

That clearing was the first phase of a multi-year rebuild. Crews removed hazard trees along six miles from Sunitsch Canyon to Winton and widened the corridor to its permitted 100-foot right-of-way. The PUD's plan for the work was to serve Coles Corner, Lake Wenatchee and Plain temporarily from a Puget Sound Energy transmission line, and it warned customers that outages could take longer to restore during that period.

How last winter's storms played out at the lake

The December 2025 windstorm hit the evening of December 10. It hit the Leavenworth side hardest. The PUD's update at 5 p.m. the next day said the greater Leavenworth area would likely be out 24 hours or longer. By then, Lake Wenatchee, Plain and Stevens Pass were listed as restored. A helicopter inspection had found minimal damage along the transmission line between Sunitsch Canyon and Coles Corner. The repair work that remained was close to home. On December 12, the PUD still described crews working in Ponderosa Estates.

Internet came back more slowly than power. The PUD restored the main fiber line into Lake Wenatchee, but about 150 fiber customers there were still out when it posted its December 15 update. The Wenatchee Business Journal reported that Lake Wenatchee Fire and Rescue set up a free Starlink connection at Plain Hardware for Plain and Lake Wenatchee residents. The Leavenworth Echo reported that Squirrel Tree Resort at Coles Corner took in about 40 residents displaced by the flooding. The Echo also pointed people who wanted to help toward Plain Pantry and Upper Valley MEND.

So the past year left a split record. In December, the old transmission line held, and the lake got power back sooner than town. In March, two trees on a line kept about 3,800 customers between Anderson Canyon and the summit dark for roughly a day. The PUD is also changing how it runs the system. Its 2025 annual report says a pilot of remotely controlled SCADA devices, with operating settings adjusted automatically from real-time weather data, improved reliability 38% in the Plain and Lake Wenatchee areas. The PUD plans to expand that system.

The rebuild now costs $100 million, and construction means outages

The next phase rebuilds 15 miles of the Beverly-McKenzie line from Anderson Canyon in Peshastin to Coles Corner. Wood poles get replaced with steel, the copper conductor gets replaced with higher-capacity conductor, and the substation at Coles Corner gets improvements. A May 4, 2026 presentation to commissioners added a 2-mile rebuild of the Plain Tap and a 1-mile rebuild along Highway 207. It also adds taller poles to reduce tree strikes and a new switchyard at Coles Corner to reduce the impact of outages. Design runs through 2026 and 2027, and construction is planned for 2027 through 2029.

The Leavenworth Echo reported on November 3 that the estimate has risen from $60 million to $100 million. Bringing a contractor in early produced more detailed costs for access roads, helicopter use and foundations in remote terrain, including micropiles. Divided across the roughly 3,500 customers the line serves, $100 million comes to about $28,600 each. The PUD will fund it in stages. First come two guaranteed-maximum-price contracts totaling about $10 million for design and equipment procurement. A construction contract that sets the full cost is expected before the board in fall 2027.

The same Echo report says the work will require outages that affect reliability in the area while construction is underway. If you buy a cabin this winter, you'll own it through the whole construction period. The line should be stronger at the end. In the meantime, plan for planned shutoffs on top of the storms.

What to look at in a specific cabin

Whatever the rate turns out to be, these are the questions that matter for one particular house:

  1. Heat without grid power. Ask what keeps the cabin above freezing if power is off for a day, which is how long the March outage lasted. A cabin that depends entirely on electric heat is a different winter property from one with a second heat source.
  2. Backup power. Find out whether there's a generator, what it runs, and how it connects to the house. Ask the seller how the cabin came through December 2025 and March 2026.
  3. Internet at that address. Chelan PUD builds the fiber network but doesn't sell internet service. Its fiber page says availability has to be confirmed address by address with a retail provider. The providers it lists include 509Fiber, Advanced Stream, Fiopin, LocalTel & NWInternet, Native Network, NCI DataCom, NoaNet Community Broadband, Valley Smart Homes and Wenatchee Computer. "Lake Wenatchee/Plain" appears on the PUD's build-out list. The May presentation also describes underground fiber from Stevens Pass to Sunnyslope that would lower the cost of fiber-to-home buildout between Lake Wenatchee and Stevens Pass.
  4. Winter access to the house. Ask the seller who clears the driveway and the road after a storm, and how quickly. A line crew that can't reach the house can't reach its service connection either.

The rates above are dated, published figures and general information. They aren't legal, tax or financial advice, so confirm your own situation with the utility and the right professional before you budget around them. For the financing side of a lake purchase, see our guide to second-home mortgages for lake homes.

A few quick answers

Does the rebuild change anything this winter? Not the physical line. Design and equipment procurement come first, and construction is planned for 2027 through 2029.

Is Plain on the same line? Yes. The Beverly-McKenzie line serves customers from Plain to Stevens Pass, and the planned rebuild includes the 2-mile Plain Tap.

Where can I follow the project? The Chelan PUD commission posts its meeting materials and agendas on its commission meetings page. The construction contract is expected to come before the board in fall 2027.

If you're weighing a Lake Wenatchee cabin this winter, Team Stoddard is glad to go through the heat, backup power, access and fiber at a specific address with you. If you own a cabin out here and want to know how buyers will weigh its winter setup, start with our Instant Home Valuation, and then let's walk the property together.